New York Governor Andrew Cuomo has approved what will be the longest U.S. offshore wind farm when it’s built off the east end of Long Island. When it’s all said and done, it will generate enough electricity to power more than 50,000 homes on Long Island’s South Fork. Computerworld reports: The South Fork Wind Farm will consist of 15 wind turbines with 90 megawatts (MW) of capacity. While the project still needs to complete its permitting process, construction could start as early as 2019 and it may be operational as early as 2022. The approval of the South Fork Wind Farm, to be located 30 miles southeast of Montauk, is the first step toward developing 1,000 megawatts (1 gigawatt) of offshore wind power, Cuomo said in a statement. The wind farm approval comes two weeks after Cuomo’s State of the State Address, during which he called for the development of 2.4 gigawatts of offshore wind by 2030. The 2.4 gigawatt target, which is enough power generation for 1.25 million homes, is the largest commitment to offshore wind energy in U.S. history, Cuomo said. Cuomo wants New York state to get 50% of its energy from renewable sources by 2030. The nation’s first offshore wind farm, the Block Island Wind Farm, went live last month. Both the Block Island and South Fork wind farms are owned by Deepwater Wind, a company based in Providence, R.I.
Read more of this story at Slashdot.